When One Gauge Disagrees
On Deepwater Horizon, the drill pipe showed pressure while the open kill line showed no flow. The National Commission found that the readings never appear to have been reconciled. The test was nevertheless accepted. [1, pp107-109]
On 20 April 2010 the Deepwater Horizon crew carried out a negative-pressure test during preparations to abandon the Macondo well temporarily. The test reduced the pressure holding fluids in the well so the crew could check whether the barriers were keeping them out. A successful test required no flow or pressure buildup under the specified conditions. [1, pp106-109]
The National Commission describes repeated attempts to bleed pressure from the drill pipe. It rose again after each attempt, ultimately reaching 1,400 psi. A further test monitored the kill line, another route to the well. Pressure there was bled to zero and no flow was observed for 30 minutes, while the drill pipe still showed 1,400 psi. [1, pp107-109]
The Commission attributes the "bladder effect" explanation to post-incident statements from the two BP Well Site Leaders. Lee Lambert recalled the explanation but did not recall anyone agreeing or disagreeing. At 8pm the Well Site Leaders, in consultation with the crew, accepted the negative test. The report describes that conclusion as a key error. [1, pp107-109]
The first explosion occurred at approximately 9:49 p.m. that night. Eleven people died. [1, pp111-115]
The Commission qualifies parts of this account because it depends on witness statements and the information available after the disaster. I cannot reconstruct every exchange or everyone's belief. The report does establish the unresolved pressure reading and the decision to proceed. [1, pp107-109]
What I take from it is that an explanation needs to account for the measurements. Calling the pressure a bladder effect did not establish that the well was sealed. The Commission concluded that, on the available information, the drill-pipe pressure could only have been caused by a leak into the well. [1, pp108-109]
What would I ask when two measurements disagree? First, what each explanation predicts; then, what check could tell the explanations apart. A reading that fits more than one explanation settles nothing by itself. And on a safety-critical test, I would want the acceptance criteria and the authority to stop settled before work continues.
I open Chapter 1 of What Are We Missing? with this case, using it to examine how a decision can proceed while important evidence remains unresolved.

Zafar Alam is a civil engineer and Chartered Construction Manager with about 12 years on major projects. He is the author of What Are We Missing? How to Think More Clearly Before You Decide, planned for 13 February 2027.
Sources
[1] National Commission, Deep Water (2011), printed pages 106-109 and 111-115. Test interpretation, witness attribution, decision timing and the first explosion. https://www.govinfo.gov/content/pkg/GPO-OILCOMMISSION/pdf/GPO-OILCOMMISSION.pdf